| 1 |
JGC (Malaysia) Sdn Bhd |
INQ-6212-60/A0-01 | Petronas LNG Train 9 Project – Piping and Painting Works (JV with Penta Global Engineering Company LLC) |
May 2014 – Jan 2016 |
| 2 |
Real Offshore Installation Company Sdn Bhd |
Engineering, Procurement, Construction, Transportation, Installation, Testing and Pre-commissioning and Commissioning of B17 Lateral Pipeline SUBJECT : Provision of Fabrication Services (SC-006) |
19 Mac 2009 |
| 3 |
MISC Berhad |
Supply, Fabrication & Delivery of Pipeline End Manifold & Tether Base for FPSO Ruby |
19-Feb-09 |
| 4 |
ExxonMobil Exploration and Production Malaysia Inc. |
To Fabricate :- A) Spool for G-037-1/2/3. To 6” c/w Erection Materials A) Spool for G-037-1/2/3. To 6” c/w Erection Materials |
Jan-09 |
| 5 |
PETRONAS Methanol (Labuan) Sdn Bhd |
Procurement & Construction Works for Firewater System Upgrade – Phase 1 (PMLSB/06/2008/0009) |
29-Aug-08 |
| 6 |
MSD Petronas Penapisan |
Supply & Delivery VV Urgent Material :- Monel 400, UN S04400 Plate Size :- 3MM x 1500 x 3000 |
5-Aug-08 |
| 7 |
MSET Engineering Corporation Sdn Bhd |
Supply of Launcher & Receiver for West Lutong Pipeline Replacement |
27-Jul-08 |
| 8 |
Petrofac (Malaysia-PM304) Ltd |
The Provision of Fabrication & Installation Work For MOPU Cooling Line |
2-Jul-08 |
| 9 |
CCM Fertilizers Sdn Bhd |
The Construction and Completion of the Proposed Refurbishment & Modification Works of Warehouse, Raw Material Plant, Packing Plant & Product Curing Bay at CCM Fertilizers Sdn Bhd, Selangor Darul Ehsan |
17-Jun-08 |
| 10 |
PTSC Production Services Company Ltd |
Fabrication and Transportation of Pipeline End Manifold (PLEM) for FSO ORKID |
17-Jun-08 |
| 11 |
Talisman Malaysia Ltd |
Fabrication of Pipework for South Angsi Infill Well |
5-Jun-08 |
| 12 |
PETRONAS Carigali Sdn Bhd |
To Supply Welder for BCOT T-3356 |
6-May-08 |
| 13 |
PETRONAS Carigali Sdn Bhd |
Provision of Sponge Jet and Advanced Epoxy |
27 Mac 2008 |
| 14 |
MSET Engineering Corporation Sdn Bhd |
Design, Fabricate, Commissioning, Supply & Delivery One (1) Unit of Fuel Gas Scrubber |
19-Mar-08 |
| 15 |
ExxonMobil Exploration and Production Malaysia Inc. |
To Fabricate: – A) Spool for L/P Flare by Pass Piping c/w Erection Material B) Spool 2’ Piece Reducer FWP P-510B C) Spool for Glycol Heat Exchanger HX-545 D) Pig Catcher for LWA FWS Receiver @ Sea E) Gen Room Ventilation Louver & Install Baffic Plate between Radiator F) Spool for G-17 Equalizing Line Tie-in to Well Flow line G) Spool for 4 Vent Line Pipe Support Infill Drilling c/w Erection Materials H) Spool for A-18 GI (Single) Flow line I) Spool for Convert A-7U OP Flow line to Gas Injection J) Spool for QTRS Firewater Pipe Leak K) Spool for QTR Sprinkle Piping Repair L) Spool for Gas Lift Header Leak c/w Erection Materials M) Hot Deep Grating @ Riser And Boat Landing Area N) Spool for B-7 Replacement Flow line c/w Erection Materials O) Spool for Pipe Stand & New PWP And South H.P Drain Line c/w Erection Materials P) Spool for Install New Strainer Upstream LCV-241B c/w Erection Material |
Feb – Dec 2008 |
| 16 |
Malaysia LNG Dua Sdn Bhd |
MLNG Debottlenecking (MDD) Project. Contract No : C06MDD 153. Relocation Of Existing Facilities (Module 4,5 and 6) |
22-Aug-06 |
| 17 |
PETRONAS Dagangan Berhad |
The Re-commissioning Of Existing Jet A-1 Hydrant Pipeline Facilities For Pit Valves No.15 to 18 at Subang Aviation Terminal |
2005 |
| 18 |
PETRONAS Dagangan Berhad |
The EPCC Of Fuel Hydrant Extension And Modification Works At KLIA For The Low Cost Carrier (LOC) Terminal And New Airbus A380 Paring At Bay C17, C27 And C37 |
2005 |
| 19 |
PETRONAS Penapisan (Terengganu) Sdn Bhd |
Kerteh Refinery Rejuvenation Project (KRR) (TNI Work) at Petronas Penapisan (Terengganu) S/B |
2004 – 2005 |
| 20 |
OGP Technical Services Sdn Bhd |
The Procurement, Construction and Commissioning of MLNG Interconnecting Piping Project. |
Sept 2004 – March 2005 |
| 21 |
PETRONAS Dagangan Berhad |
The EPCC of reinstatement of Motor Gasoline (MOGAS) Facilities at Pasir Gudang Bulk Depot, Johor |
13 July 2004 – March 2005 |
| 22 |
OGP Technical Services Sdn. Bhd. |
The Procurement, Construction and Commissioning of the MLNG Second Solvent Storage Tank and Associated Facilities at PETRONAS LNG Complex. |
24 May 2004 – September 2004 |
| 23 |
OGP Technical Services Sdn. Bhd. |
The Procurement, Construction and Commissioning of the MLNG Solvent Storage Tank Project. |
19 January 2004 – 15 April 2004 |
| 24 |
OGP Technical Services Sdn. Bhd. |
Procurement, Construction and Commissioning of MLNG-DUA Ucarsol AP814 Project. |
16 April 2003 – September 2003 |
| 25 |
Malaysia LNG Sdn. Bhd |
Contract No : CO2 MRR249. Module 1 Boilers 1F5110/20/30 Rejuvenation / Revamp |
03 Dec. 2002 – 20 Oct. 2003 |
| 26 |
Malaysia LNG Sdn. Bhd |
Contract No : CO2 MRR 164. Mechanical Work for Module 4 & 5 Plus Incinerator for MLNG Rejuvenation and MLNG/MLNG 2 Revamp. |
March 2002 – September 2003 |
| 27 |
Malaysia LNG Sdn. Bhd |
Contract No: C01MRR 117. MLNG Rejuvenation and MLNG/MLNG 2 Revamp (MRR) . Mechanical Work for Dua Sulfinol Revamp. |
30 May, 2001 – 24 Oct, 2001 |
| 28 |
PETRONAS Gas Berhad |
Contract No.: 6000089982. Price Agreement for Painting Work at PGB Export Terminal, Tg. Sulong, Kemaman for a period 1 + 1 Year. |
01 Feb 2001 – 01 Feb 2002 |
| 29 |
Ethylene Malaysia Sdn. Bhd / Polyethylene Malaysia Sdn. Bhd |
Term Contract Manpower Supply for Mechanical Works for Ethylene Polyethylene Malaysia Sdn. Bhd. |
28 May 2001 – 30 May 2002 |
| 30 |
PETRONAS Dagangan Berhad |
The Decommissioning of Fuel Hydrant Pipelines at Sultan Abdul Aziz Shah Airport, Subang Selangor Darul Ehsan. (ITQ No. : 101245) |
19-Sep-00 |
| 31 |
Petronas Dagangan Berhad |
The Decommissioning of Existing Underground Jet A-1 Fuel Hydrant Line at The Air Cargo Complex and Terminal 2, Subang Airport. |
1999 |
| 32 |
Petronas Dagangan Berhad |
The Procurement, Construction and Commissioning of Aviation Fuel Hydrant Line Extension at the Second Air Cargo Complex, Bayan Lepas . (Tender No. : 101045) |
1999 |
| 33 |
Malaysia LNG Sdn. Bhd |
Contract No. CSR/98/035/PE. Deluge Piping Replacement |
1999 |
| 34 |
Asean Bintulu Fertilizer Sdn Bhd |
Ammonia Revamp 2 Project Mechanical Construction Work (ABF/ETC/96/010) |
1997 |
| 35 |
Asean Bintulu Fertilizer Sdn Bhd |
Ammonia Revamp 2 Project. Electrical Supply & Installation Work |
1997 |
| 36 |
Malaysia LNG Sdn Bhd |
Module 1,2 and 3 Deluge Pipe Replacement. |
1996 |
| 37 |
Petronas Penapisan Terengganu Sdn. Bhd. |
Supply, Construction, Installation of Civil, Structural, Mechanical, Piping, Instrument and Electrical Works for Fire Fighting Facilities Upgrade Project. |
1995 |
| 38 |
Petronas Dagangan Berhad. |
Maintenance and Upgrading of Production Lines at Petronas Dagangan Depot, Prai, Jetty, Penang. |
1994 |
| 39 |
Petronas Gas Berhad |
Supply, Delivery, Coating and Storage of Pipe for PGU III (Sector I) |
1994 |
| 40 |
Petronas Dagangan Berhad |
Supply and Installation of Harbour Boom for Jetty at MLNG-DUA Sdn. Bhd, Bintulu, Sarawak. |
1994 |
| 41 |
JGC-Kellogg JV |
Supply and Commissioning of MCR and Propane Compressors for Jetty at MLNG-DUA Sdn. Bhd., Bintulu, Sarawak. |
1992 – 1993 |
| 42 |
Comprimo Sdn. Bhd |
S.R.C New Ship Export/Import Facility, Shell Refinery, Port Dickson |
1992 |
| 43 |
Hyundai Engineering & Construction Co. Ltd |
Supply of Air Cooled Heat Exchangers and Lean Solution Pumps for GPP 2 & 3, Kerteh, Terengganu |
1991 |
| 44 |
Esso Production Malaysia Inc. |
Supply and Commissioning of Process Centrifugal Pumps for EPMI Slugcatcher, Kerteh, Terengganu |
1991 |